Upgrading from AVPro Video 2.x
If you have existing projects based on the legacy AVPro Video 2.x product, it is possible to upgrade them to AVPro Video 3.x using the steps below.
Note
It is not possible to have AVPro Video 2.x and 3.x in separate folders within the same project as there would be conflicts.
Before starting this process we recommend having a backup or source control for your project.
Scenes, Prefabs and Scripts
We have tried to maintain the same API across v2.x and v3.x and as a result, existing scenes, prefabs and scripts should not require any changes/updates.
Upgrading
- Close Unity and open your project up fresh (otherwise some of the plugin files will be locked if you have used the AVPro Video scripts or plugins during your editor session, which will prevent them from being deleted)
- Ensure your project contains a version of AVPro v2.x and is error free and AVPro Video is working as you would expect
- Import the latest AVPro Video 3.x package into your project. You will notice there are a few warnings reported, this is normal and to be expected at this stage
Nativate to the 'Window->AVP Pro Video Support' drop down menu, as shown below
In the 'AVPro Video - Help & Support' dialog window, select the 3rd tab 'Update v2.x to v3.x' and follow the instruction steps